Home » Blog » After Exchange of Contracts in England: Deposits, Insurance and What Happens If Someone Pulls Out
Stone terraced cottages on Hustler's Row, Leeds

After Exchange of Contracts in England: Deposits, Insurance and What Happens If Someone Pulls Out

Until contracts are exchanged, buying a home in England is a series of promises that nobody is legally bound to keep. Either side can walk away, change the price or disappear without paying a penny in compensation. Exchange is the moment that changes. Once your conveyancer and the seller’s conveyancer swap signed contracts, you are both committed, and backing out from that point on gets expensive.

Many first-time buyers focus so hard on getting to exchange that they do not ask what happens after it. Here is what changes, what you are expected to pay, and what the rules say if someone fails to complete.

The deposit you pay at exchange

The usual deposit on exchange is 10% of the purchase price, paid through your conveyancer before contracts are swapped. A lower figure, often 5%, is sometimes agreed, particularly where a buyer’s own funds are tied up in a sale or a small mortgage deposit. This exchange deposit is separate from your mortgage deposit, although in practice part of the same money often goes towards both.

A lower deposit has a catch. Under the standard residential terms most contracts use, if a buyer fails to complete and the seller serves a notice to complete, the seller can require the deposit to be topped up to the full 10%. Agreeing 5% at exchange does not cap your exposure at 5%.

The gap between exchange and completion

Completion is the day the money moves, the seller moves out and you get the keys. The gap after exchange is set in the contract. One to two weeks is common, chains can stretch it to about four, and a chain-free purchase can exchange and complete on the same day.

Use that gap well. Book removals, arrange meter readings and redirect post. Your conveyancer will also request the mortgage funds from your lender so they arrive in time for completion.

Brick terraced houses on Victoria Terrace in Leeds, England
Photo: David Martin, CC BY-SA 2.0, via Geograph and Wikimedia Commons

Insurance from the day you exchange

Because you are now committed to buy, most conveyancers advise having buildings insurance in place from exchange, and your mortgage lender will insist on cover by completion at the latest. If the house were damaged by fire or a flood between exchange and completion, you could still be obliged to go ahead. A policy starting on exchange day is cheap protection against a very bad outcome.

If the buyer pulls out after exchange

Walking away after exchange is a breach of contract. If completion does not happen on the agreed date, the seller can serve a notice to complete, which usually gives the buyer 10 working days to finish the purchase. If the buyer still fails to complete, the seller can generally rescind the contract, keep the deposit, put the house back on the market and, in some cases, claim further damages for losses the deposit does not cover.

Courts rarely order a seller to hand back a forfeited deposit without something exceptional, so a buyer who cannot complete should assume the deposit is gone.

If the seller pulls out

The same logic works in reverse. A seller who refuses to complete after exchange must return your deposit and can be sued for your losses, such as extra rent, storage or a more expensive replacement mortgage. A buyer can also ask the court to force the sale through, known as specific performance, though that route takes time and legal costs.

Late completion: interest by the day

Delays happen more often than outright withdrawals, usually because money in a chain arrives late. The party causing the delay normally pays interest to the other side for each day of delay, at the rate set in the contract. That rate is often the Law Society’s interest rate, which is 4 percentage points above the Bank of England base rate. On a large purchase price, a few days of delay can add up to a noticeable sum.

Completion day and the weeks after

Keys are released once the seller’s conveyancer confirms the money has arrived. Most completions are finished by early afternoon, but a slow chain can push that later. After completion, your conveyancer registers you as the new owner with HM Land Registry and files your Stamp Duty Land Tax return. The SDLT return and payment are due within 14 days of completion, even if no tax is owed, which matters for first-time buyers using relief.

Our Stamp Duty calculator will show the figure your conveyancer should be paying, and the Closing Day & Final Walk-through Checklist covers what to check when you pick up the keys.

Worth knowing before you sign: do not exchange until your mortgage offer is in place and you are confident the completion date works for every link in your chain. Before exchange, walking away costs you only fees already spent. After exchange, it can cost you the whole deposit and more.

Related tools and guides: Closing Costs & Stamp Duty Calculator · Documents You Need to Buy a Home · Closing Day & Final Walk-through Checklist

Sources: Tozers LLP, What happens if a buyer or seller drops out after exchanging contracts; Russell-Cooke LLP, What happens if a buyer fails to complete the purchase of a property; HouseCheckup, Exchange and completion guide (July 2026); GOV.UK, Stamp Duty Land Tax. Checked October 31, 2026.

This article is general information about England, not legal advice. Your own contract may differ from the standard terms, so ask your conveyancer about your purchase.

Leave a Comment

Your email address will not be published. Required fields are marked *

Scroll to Top
Footer Community Popup Subscription

We'll use your details only to send the North Street Property newsletter. See our Privacy Policy for how we handle your data. You can unsubscribe at any time.